Choose language
Close

JELLY & PIPELINE PROJECT

  • JELLY & PIPELINE PROJECT | Australia | 2026-09-18
  • On August 7 2015, the first patch of pipes of SUNLION and Austrian Fules Company’s cooperated project Jetty & Pipeline Project has been collected successfully at Shanghai Port. The pipesare to reach Australia’s construction site in September.

    The Project comprises a diesel fuelterminal near the existing Santos Port Bonython Plant on the Eyre Peninsulanorth east of the township of Whyalla, South Australia.

    The Project scope consists of:

    •    Installationof Marine loading arms at the jetty head

    •    Constructionof Transfer Pipeline (DN500 for 5km) along existing jetty and overland to thefuel terminal facility

    SUNLION supplies high quality HFWpipe, Bends and Fittings with special marine painting and 3LPE coating for thisproject.



    Raw material preparation




    Pipe welding procedure



    Ultrasonic Test



    Bare pipe




    3LPE coating



    Pipe collection at Shanghai Port



    Pipe collection at Shanghai Port


    Copyright © 2026 SUNLION Corporation. All rights reserved.